View Single Post
  #1 (permalink)  
Old 06-20-2007
V2-V3's Avatar
V2-V3 V2-V3 is offline
Administrator
Points: 11,912, Level: 71
Points: 11,912, Level: 71 Points: 11,912, Level: 71 Points: 11,912, Level: 71
Level up: 72%, 138 Points needed
Level up: 72% Level up: 72% Level up: 72%
Activity: 100%
Activity: 100% Activity: 100% Activity: 100%
 
Join Date: Sep 2005
Location: Coeur d' Alene Idaho
Age: 20
Posts: 675
Rep Power: 10
V2-V3 is on a distinguished road
Send a message via ICQ to V2-V3 Send a message via MSN to V2-V3
Project Log: Team NexGen Cascade Phase Cooling Project

Here are some of the images i had already uploaded.

The Cascade project is stuck in my College lab ATM so i wont be able to get updated pics all too easy..

these pics were taken at the NIC HVAC-R LAB

compressor: Copeland Scroll 41K BTU
Team NexGen Cascade project

Using Manifold gauges to vacuum check the compressor, about 25'' Mercury Vacuum

Filling the Scroll with 42oz of POE oil.

Pic of electrical progress.

Relay

Toggle switch for relay

440V Run Compositor

208V AC electrical for Copeland Scroll

Electrical Digram for 1PH 208V Copeland Scroll