View Single Post
  #4 (permalink)  
Old 09-10-2007
V2-V3's Avatar
V2-V3 V2-V3 is offline
Administrator
Points: 11,970, Level: 71
Points: 11,970, Level: 71 Points: 11,970, Level: 71 Points: 11,970, Level: 71
Level up: 72%, 80 Points needed
Level up: 72% Level up: 72% Level up: 72%
Activity: 50%
Activity: 50% Activity: 50% Activity: 50%
 
Join Date: Sep 2005
Location: Coeur d' Alene Idaho
Age: 20
Posts: 676
Rep Power: 10
V2-V3 is on a distinguished road
Send a message via ICQ to V2-V3 Send a message via MSN to V2-V3
Re: Koolance CPU 330 & Danger Den Barbs

1/2 DD Barb bottom thread to O-Ring 6.5mm, Total Thread length W/ O-Ring 10mm
1/2 Koolance Barb bottom thread to O-Ring 3.5mm, Total thread lenght w/ O-Ring 4mm


Koolance Barb is designed to not penetrate the top of the block. (.5mm Clearance)
DD barb not designed for Koolance block, Penetrates the top of the block (4.5mm) and actually enters the "water chamber" with 2mm threads, Leaving just 2mm (50%) of clearance above the pyramids.

All this assuming an ideal condition where you don't have to squish the O-Ring :P

Im going to have to test this one to see how it effects Performance/Flow

Now only if there was a sponsor for some flow meters






__________________
"If It Don't Overclock Its Broken"

Folding@Home Team NexGen #54168

Last edited by V2-V3; 09-10-2007 at 01:00 PM.
Reply With Quote